Some of the Committee Members traveled back to Appleton, Wisconsin with our Dealer Randy Schwartz to complete the Final Inspection of Engine 93. The committee worked long hours going line item by line item and every little detail of the apparatus. After we were complete there were about 15 or so things that needed to be looked at or changed on the Engine. In the next few weeks it is expected to arrive at the Station where tool mounting and training will be done so that the Tanker can be placed in-service around the 1st of the Year.
Committee Members that completed the Inspection were: Shawn Downs Jeff Evans Pat Stanley Jim Foster Les Hansen |